A suspended ceiling is a plane of its own: it carries light, damps sound, takes services out of sight and levels out a crooked slab. MK-AUSBAU plans that plane on a grid and builds it true.

Area covered
Heinsberg and district
In drywall since
2016
Surface
Finished Q1 to Q4
View up into a suspended ceiling with continuous slats and recessed light fittings
Ceiling plan

01Build up

Four layers between slab and room

A suspended ceiling is built downward. Every layer has a job, and every layer can be got wrong. That is why it is planned before the first hanger goes up.

Layer 1
01

The slab

Concrete or timber joists. It carries the load of the new plane and decides which fixing is allowed. What sits above is checked before anything is measured.

Layer 2
02

The suspension

Hangers set on the axis grid and adjustable in height. Where quiet matters, resilient hangers go in between so that the new plane never touches the old one.

Layer 3
03

The substructure

Primary and secondary channels cross on the grid, with the perimeter channel running round the walls. That grid decides where a light fitting may later sit.

Layer 4
04

Boarding and joints

Plasterboard screwed in staggered courses, joints filled, taped and finished to the agreed quality level.

NoteHow much depth the construction needs is settled on site: by how uneven the slab is, by the services in the void and by what has to be built into the plane.

02Ceiling plan

The reflected ceiling plan decides first

The reflected ceiling plan is the finished plane seen from below. Axes, light fittings, outlets and access panels are placed on it before anyone drills.

Ceiling plan
Primary channel The upper axis the hangers sit on Secondary channel The lower axis the board rests on Perimeter The channel running round the walls
01

Light fittings

Every downlight needs room between two channels and clearance from the insulation. On the plan that is a minute of work, in a finished ceiling it is a strip out.

02

Outlets

Ventilation, smoke detectors and speakers are given their positions before the plane is closed.

03

Access

Anything that has to be serviced needs an opening. Where it goes belongs in the plan and not in a later search.

04

Joint pattern

Board joints follow the grid. A properly set out joint pattern is the difference between a surface and a patchwork.

NoteThe plan is not paperwork. It is the cheapest place a mistake can still be made, because there it costs nothing.

Let us talk about your ceiling before the plan is fixed.

A few sentences are enough for a first assessment.

Discuss your ceilingCall us directly

03Reasons

When a suspended ceiling is the answer

Not every room needs a second ceiling plane. These six reasons carry one.

01

Hiding services

Ventilation, wiring and pipework run in the void, with no chasing cut through existing fabric.

02

Planning light instead of hanging it

Downlights, coves and light lines sit where they are needed, because the plane was built for them.

03

Getting quiet

The suspended plane acts as a second leaf against noise from above. How well it works is decided by the isolation.

04

Levelling a crooked slab

In an older building the slab is rarely flat. The new plane is set to a level of its own, whatever sits above it.

05

Meeting fire requirements

F30 and F90 are reached through tested system build ups. Which build up applies is stated in the manufacturer approval, and that is what gets built.

06

Giving a room structure

A stepped ceiling area separates cooking from dining without a wall being needed.

NoteIf none of these apply, we say so. We do not build a ceiling whose only effect is to cost you head height.

04Light

Light inside the plane

A suspended ceiling is the easiest place for light to become part of the room instead of a device on the ceiling.

Corridor with a suspended grid ceiling and a light cove running round the perimeter
01

Downlights

Set on the grid, not wherever there happened to be space. The cut out is drilled once the position is fixed.

02

Light cove

A perimeter edge with a concealed fitting. The light comes back off the wall and the ceiling reads higher.

03

Light joint

A narrow slot in the field that light comes out of. It asks for a clean profile and a straight line over the whole run.

NoteYou choose the fittings. We build the plane so that they fit, and settle the positions with the electrician beforehand.

05Acoustics

Quiet comes from isolation

A single leaf ceiling passes sound straight on. A suspended ceiling acts as a second leaf, but only while it never touches the first.

Mass, spring, mass

Two heavy leaves with a resilient void between them: that is the principle by which drywall goes quiet. The mineral wool in the void and the yielding channel work together like a shock absorber and slow the vibration before it reaches the lower leaf. Any rigid connection between the two cancels the effect again.

01

Resilient hangers

Spring hangers separate the new plane from the slab. Without them every hanger is a sound bridge.

02

Mass where it counts

A double layer of board puts weight into the lower leaf. Weight is the simplest lever in sound insulation.

03

Perimeter detail

Sealing tape under the wall channel and a properly separated edge decide more than any data sheet.

04

A closed surface

Every open joint and every unsealed outlet lets sound through. A surface is only tight when it is tight everywhere.

Common mistake

One mistake is common with timber joist floors: take out the heavy fill, put light wool in its place, and the floor becomes a drum. The result is worse than before the work started. We look at what is up there before anything comes out.

06Edges

Edges, joints, surface

A ceiling is judged at its edges. That is where the new plane meets everything that was already there.

Drawing
01

Wall junction

All the way round, on sealing tape, exactly on the level line. The laser sets that line once and everything after it follows.

02

Shadow gap

A deliberately open slot between ceiling and wall. It separates the planes visually, absorbs movement and forgives what a rigid edge would display.

03

Movement joint

Large areas and long corridors get a joint so that the surface can move without cracking.

04

Taped joints

Fill first, bed the tape properly, then skim over it. Tape that has only been skimmed shows itself later.

Q1
Basic filling, for surfaces that stay hidden.
Q2
Standard, for paint and textured wallcovering.
Q3
Extended, for fine textures and matt paint.
Q4
Full skim, for sheen and for grazing light.

NoteWhich level your ceiling needs depends on the light. Grazing light from a cove shows in Q2 what would never be visible in Q4.

Let us talk about your ceiling before the plan is fixed.

A few sentences are enough for a first assessment.

Discuss your ceilingCall us directly

07The firm

Who stands on the ladder in your room

MK-AUSBAU is an interior fit out firm from Heinsberg. Maxim Kelm started out as a drywall fitter in 2016 and runs the business to this day.

Ceilings are not a by product of walls. They hang free, they carry light and services, and they show every fault, because light runs along them. That is why we plan the ceiling plane rather than improvise it.

We work throughout the district of Heinsberg and beyond, in flats, houses and commercial space. Where other trades are needed we coordinate them as well, so that the site has an order to it.

Anyone planning a ceiling has to know the light that will later fall across it.

Drywall

Partitions, linings and ceilings on a metal substructure.

Insulation

From mineral wool to straw, in the ceiling void and across the plane.

Painting

The final finish after filling, on the completed surface.

Floor coverings

So that one room is not finished on three dates by three firms.

Internal doors

Measured and fitted to suit the new layout.

08Process

How a ceiling runs with us

Six steps, in this order. Each one has a result you can see.

  1. 01

    Enquiry

    Room, dimensions, purpose, a few photographs. That is usually enough to judge what we are talking about.

  2. 02

    Site visit

    Check the slab, measure the heights, find the services, look at the junctions.

  3. 03

    Ceiling plan

    The grid, the fittings, the outlets and the access panels are fixed and agreed with you.

  4. 04

    Quotation

    Build up, quality level and scope in writing, so that what is compared stays comparable.

  5. 05

    Installation

    Level line, hangers, substructure, insulation, boarding, filling.

  6. 06

    Handover

    Walking the surface together, in the light that will actually be on.

09Enquiry

Your ceiling, in a few lines

A name, a phone number and a few sentences are enough. We will come back to you.

Address
Am Diebsweg 17, 52525 Heinsberg

What helps on the first call

  • Place and room: where the building is, which room is meant
  • Area and room height, roughly is fine
  • What sits above: concrete, timber joists or unknown
  • What should go in: light, ventilation, insulation, sound
  • Two to five phone photographs: overall, wall junction, access

By sending you agree that we may process your details in order to answer the enquiry. The privacy notice has the detail.

10Photographs

Photographs from ceiling work

Six stages of a ceiling plane, from the stripped slab to the finished surface.

SurveySlab exposed
Setting outThe level line
MaterialChannels and compound
BoardingCutting to size
FinishSanding the surface
ResultThe finished plane

NoteThe photographs show typical work and components from ceiling construction. They are not a record of individual customer projects.

11Area

Where we build ceilings

MK-AUSBAU is based in Heinsberg and works across the whole district. A ceiling takes several days, so the journey counts.

Base

Heinsberg

District

HeinsbergHückelhovenErkelenzGeilenkirchenWassenbergWegbergÜbach-PalenbergGangeltSelfkantWaldfeucht

Beyond that

MönchengladbachAachen

NoteIf your building lies outside, ask anyway. We will say honestly whether the journey makes sense for both sides.

12Questions

Common questions about suspended ceilings

What clients in the district of Heinsberg ask most often.

How much head height does a suspended ceiling cost?

That depends on what has to go into the void and how flat the slab is. A plain ceiling needs little, a ceiling with ventilation, insulation and downlights needs considerably more. At the site visit we measure the height you have and work the build up through from below before you commit to anything.

Can I fix something to the ceiling later?

Yes, if it is known beforehand. Loads belong in the plan: a trimmer in the grid, a reinforcement in the field, or a fixing straight into the slab. Drilling into closed plasterboard afterwards is the worst of the three options.

Will it actually be quieter?

A suspended plane acts as a second leaf and can damp noise from above considerably. What decides it is the isolation: resilient hangers, insulation in the void and a properly separated perimeter. Without those three you have simply hung a second board on a rigid connection.

What about fire protection?

F30 and F90 are achieved through tested system build ups. The build up is then not a free choice: board type, screw spacing, channel grid and junctions are all set out in the system approval. If your ceiling has to meet a requirement, we establish which one first.

Which surface quality do I need?

The light decides. Under grazing light from a cove, or with glossy paint, Q4 makes sense; under ordinary room lighting with textured wallcovering Q2 is often enough. We agree the level beforehand, because it changes the effort noticeably.

How do I write an enquiry that gets answered quickly?

Place, room, rough area, room height, what sits above, what should go in, and two to five photographs. With that we can usually judge the job without a call back and tell you what the next step is.

Call Enquiry

site_langOne cookie, and it is for the language

This site sets exactly one cookie, named site_lang. It holds only the language code de, en, pl or ru, expires after one year and is strictly necessary under section 25(2)(2) TDDDG. It never forwards you anywhere, and there is no analytics cookie and no third party cookie.

Legal notice

Details under section 5 of the German Digital Services Act

MK AUSBAU Innenausbau & Sanierung

Am Diebsweg 17

52525 Heinsberg

Deutschland

Represented by

Maxim Kelm

Contact

Phone: +49 (0) 2452 8607038

Email: info@ausbau.nrw

Web: https://ausbau.nrw

VAT

VAT identification number under section 27 a of the German Value Added Tax Act: DE455780354

Responsible for the content under section 18 paragraph 2 MStV

Maxim Kelm, Am Diebsweg 17, 52525 Heinsberg

Dispute resolution

We are neither willing nor obliged to take part in dispute resolution proceedings before a consumer arbitration board.

Liability for content

The content of this page was produced with the greatest care. We cannot guarantee that it is accurate, complete or current.

Everything stated here about build ups, components and site sequences is general guidance on ceiling work. It replaces neither an assessment of your own building nor a manufacturer approval.

Liability for links

This page links to external sites whose content we do not control. The respective provider is always responsible for the content of a linked site.

Copyright

The content and works created for this page are subject to German copyright law. Reproduction, adaptation, distribution and any kind of use beyond the limits of copyright require the written consent of the respective author.

Privacy notice

This page processes as little data as possible. There are no advertising networks, no analytics services and no embedded content from other providers.

Controller

Maxim Kelm, MK AUSBAU Innenausbau & Sanierung, Am Diebsweg 17, 52525 Heinsberg

Phone: +49 (0) 2452 8607038, email: info@ausbau.nrw

Opening this page

When the page is requested your browser transmits technically necessary data to the server, including the address requested, the date and time, the browser used and the IP address. That data is required to deliver the page and is deleted after a short period. The legal basis is article 6 paragraph 1 letter f of the General Data Protection Regulation.

This page embeds no third party scripts and sets no cookie for advertising, reach measurement or recognition.

Language and cookie

This site sets a single cookie, named site_lang. It stores only the code of the language you are reading, expires after one year, applies to this site alone and is passed to nobody. The legal basis is section 25 paragraph 2 number 2 TDDDG, because it is strictly necessary for the language selection.

The cookie drives no redirect. The home page always shows the German version, and your acknowledgement of the cookie notice is kept in your browser local storage rather than in a second cookie.

Enquiry form

When you send the form, your enquiry is transmitted in encrypted form to the central enquiry system of the platform this site is operated on. It is stored there for us and we are notified that it arrived. The data processed is your name, your phone number, your email address if you give one, and your description of the project.

We use those details solely to answer your enquiry and prepare a quotation. The legal basis is article 6 paragraph 1 letter b of the General Data Protection Regulation together with your consent under article 6 paragraph 1 letter a.

To guard against automated submissions the form contains a hidden field that stays invisible to you, and a limit on how many submissions one sender may make. No additional personal data is collected for that.

Your enquiry is deleted once it has been dealt with and no statutory retention period stands in the way.

Contact by phone or email

If you call or write to us, we process the details you give in order to deal with your request. We do not pass that data on without your consent.

Your rights

You have the right to information about the data held about you, to rectification, to erasure, to restriction of processing, to data portability and to object to processing. Consent once given may be withdrawn at any time with effect for the future.

Please contact the controller named above. You also have the right to complain to a data protection supervisory authority.

Encryption

This page is delivered exclusively over an encrypted connection. Even so, complete protection of data in transit over the internet is not possible in every case with current technology.

Cookie notice

This page sets exactly one cookie, and only because the language choice would otherwise not work.

site_lang

Name: site_lang. Purpose: to record the language you chose so the language selector shows it as the current one. Content: nothing but the language code de, en, pl or ru.

Lifetime: one year. Scope: this site only. The cookie is not passed to any third party and never redirects you: the home page always shows German, whatever is stored.

Legal basis

The legal basis is section 25 paragraph 2 number 2 of the German Telecommunications Digital Services Data Protection Act, because the cookie is strictly necessary for the function you asked for. No consent is required for it, and therefore no consent banner either.

Deleting it

You can delete the cookie in your browser settings at any time. The page keeps working exactly as before, only the language selector starts from German again.